CONSTRUCTION OF A HIGHWAY EMBANKMENT ON THICK MARSHY GROUND
Abstract
A section of a bypass motorway north of Kaposvár, South Hungary, was to traverse a fishpond in a length of 150 metres field up with thick (up to 7 meters), fresh, water-logged, organic sediments. Removal of the thick, soft soil was disregarded of enormous costs. In order to prevent base failure stage construction has been adopted using counter-weight berms. By continuous monitoring of settlements, it has been possible to control construction and reliably predict final consolidation settlements.
Keywords:
organic sediment, embankment, stage construction, monitoring of, settlementsHow to Cite
Móczár, B. “CONSTRUCTION OF A HIGHWAY EMBANKMENT ON THICK MARSHY GROUND”, Periodica Polytechnica Civil Engineering, 47(2), pp. 199–204, 2003.
Issue
Section
Research Article
License
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (see The Effect of Open Access). As soon as the paper is accepted, finally submitted and edited, the paper will appear in the "OnlineFirst" page of the journal, thus from this point no other internet-based publication is necessary.